BridgesPost-tensioned box girders and segmental decks spanning rivers, valleys and rail corridors.
Tyros Pre-stressing Systems · Adroit Group
Post-tensioning systemsfor critical infrastructure.
Post-tensioning anchorages made in India, and site stressing services for bridges, metro viaducts, buildings, tanks and tunnels.
0 t
Max UTS per tendon
0
Strands in the largest head
0
Standard AT models
0
Structure types served
01 · On site
A girder, ready to be stressed.
A live TYROS site. The girder's end face carries the anchorages; the jacks on the gantry above will pull every tendon to 80% of its strength.
Five heads. One system.
Every AT anchorage shares the same cone, wedge and spiral design — sized from a 4-strand tendon at 75 tons to a 19-strand tendon at 400 tons.

12 strands · Ø15.2 mm
12 AT 15
UTS 400 t · Jacking 320 t
12 AT 15
mm- A · Cone
- 245 × 245
- B · Min edge
- 200
- C · Spacing
- 300
- D · Pocket
- 62
- E · PCD
- 200
- Duct Ø
- 90

19 strands · Ø12.7 mm
19 AT 13
UTS 400 t · Jacking 320 t
19 AT 13
mm- A · Cone
- 245 × 245
- B · Min edge
- 198
- C · Spacing
- 325
- D · Pocket
- 62
- E · PCD
- 200
- Duct Ø
- 90

12 strands · Ø12.7 mm
12 AT 13
UTS 320 t · Jacking 256 t
12 AT 13
mm- A · Cone
- 207 × 207
- B · Min edge
- 148
- C · Spacing
- 260
- D · Pocket
- 52
- E · PCD
- 175
- Duct Ø
- 75

4 strands · Ø12.7 mm
4 AT 13
UTS 75 t · Jacking 60 t
4 AT 13
mm- A · Cone
- 145 × 145
- B · Min edge
- 120
- C · Spacing
- 220
- D · Pocket
- 45
- E · PCD
- 125
- Duct Ø
- 51

7 strands · Ø12.7 mm
7 AT 13
UTS 131 t · Jacking 105 t
7 AT 13
mm- A · Cone
- 145 × 145
- B · Min edge
- 120
- C · Spacing
- 220
- D · Pocket
- 45
- E · PCD
- 125
- Duct Ø
- 51
Built into the structures that carry cities.
Pre-stressing has replaced conventional construction wherever spans get long and sections get slender. TYROS anchorages are specified across all of them.
From forged steel to stressed strand.
The TYROS "AT" type anchorage system has been designed considering the increasing needs of pre-stressing systems of the Global Construction Industry and manufactured with well proven materials while maximizing the cost effectiveness. Today pre-stressing technology has taken over the conventional methods used in building Bridges, Buildings, Metro rails, Flyovers, Tunnels, etc.
Manufacturing
Tyros Pre-stressing Systems are manufactured at state of the art facilities for development and production of mechanical and construction related components. The sophisticated machinery available at the manufacturing centres for the various processes involved in production of equipment, and for storage and handling, is rated as one of the best in the industry.
Technical support
The technical team of Tyros Pre-stress provides every kind of necessary assistance — specifications of anchorages, anti-burst reinforcement and the methodology for pre-stressing — to each contractor for hassle-free installation.
Proven materials
Designed for the global construction industry and manufactured from well-proven materials while maximising cost effectiveness.

- Anchor head
- Anchor cone
- Wedges
Send us the tendon schedule. We'll send back the anchorage.
Anchorage specifications, anti-burst reinforcement details and the stressing methodology — for every contractor, on every job.
Need the tendons stressed too? See our post-tensioning stressing services.